Application: vertical platform lifting, or plan lifting.
Screw jacks used: Mechanical screw jacks HT200 for lifting, 2 Right angle, 1 electrical engine with double shaft projection.
Mechanical screw jacks with translating rod with protectivetube of the screw, fringed front fitting.
The HT mecanichal screw jacks (translating screw) lifts the platform, in the “O” configuration with the power supply of a single engine,suitable sized, and the utilization of 2 or more right angle.
The motion is transmitted by the cardan shafts, the mechanical connection allowed you to obtain the perfect synchronism in the lifting of the platform.
According to the different dimensions is possible to choose different combinations:
Compact Space, High Performance: The Revolution of the Bevel Helical Gearbox During the optimization process of an industrial plant, one…
Efficiency is Measured in Line: Why the Coaxial Gearbox is the True Driver of Industrial Savings In the landscape of…
The Speed Variator: A Brief Introduction The speed variator is a component that serves two fundamental purposes: it transmits motion…
The Mechanical Variator in the Electronic Era: Why It Remains an Irreplaceable Component In the age of advanced automation and…
Connecting a Three-Phase Electric Motor: Wiring Diagrams Guide Knowing how to connecting a three-phase electric motor correctly is essential to…